FANR License Renewal UAE: Requirements, Process, Documents & Fines
Renew your FANR licence with a structured, evidence-based readiness process covering documents, radiation safety, equipment records, QC, RPO responsibilities, facility changes and regulatory follow-up.
Quick answer: FANR-REG-29 requires a renewal application at least 90 days before licence expiry. Before submission, verify the licensed activity, facility details, radiation equipment inventory, RPO responsibilities, Radiation Protection Program and applicable technical evidence. If the facility has changed equipment, location, scope or protection arrangements, assess whether an amendment is required rather than treating the change as a routine renewal.
Important: FANR remains the regulatory authority and final approval decision-maker. Medcare Hub provides technical and documentation support; requirements depend on the licensed activity and facility circumstances.

Illustrative radiation equipment image · Source: Unsplash / Accuray
The 90-Day FANR Renewal Rule
Under FANR-REG-29, Article 17, a licensee must submit an application for renewal at least 90 days before the licence expiry date. A licence holder intending not to renew must provide the required evidence at least 30 days before expiry.
90 Days
30 Days
Do Not Wait
What Should Be Reviewed Before FANR Renewal?
A strong FANR license renewal file is more than an old licence with a new date. The facility should reconcile the current licensed activity with the actual site, equipment, responsible personnel and supporting technical records.
FANR License Renewal Process in the UAE
Renewal is not the same as a new FANR approval. A renewal confirms the continuing licensed activity and current compliance position, while a new application or amendment may be needed when the regulated activity, equipment, facility, location or protection arrangements have materially changed. If you are starting a new facility or applying for FANR authorization for the first time, see our FANR Approval in the UAE guide.
- Check the licence and expiry date: Confirm the current FANR licence, licensed activity, facility details and expiry date.
- Review what has changed: Compare the current facility, radiation equipment or regulated sources, rooms, shielding arrangements and responsible personnel with the previous licensing record.
- Check the technical evidence: Review applicable radiation protection documentation, safety assessments, QC records, calibration or maintenance evidence, training records and occupational monitoring records where applicable.
- Prepare the renewal file: Organize the required administrative and technical documents so the application reflects the facility as it operates today.
- Submit through FANR e-Licensing: Follow the current FANR application process and respond to any requests for clarification or additional information.
- Track the regulatory review: Keep the renewal status, correspondence and supporting evidence controlled until FANR completes its review.
Important: If the facility has changed equipment, location, licensed activity, shielding or other regulated arrangements, determine whether an amendment or another regulatory pathway is required instead of treating the change as a routine renewal.
1. Licence & Facility Information
- Current FANR licence and licensed activity
- Facility name, location and legal information
- Current scope and operating arrangements
- Any branch, room or facility changes
- Required updates to FANR records
2. Radiation Equipment
- Equipment type, manufacturer, model and serial number
- Current room/location and intended use
- Added, replaced, relocated or removed equipment
- Maintenance and service history
- Equipment inventory consistency across records
3. Radiation Protection
- Radiation Protection Program and responsibilities
- RPO/Radiation Protection responsibilities and current personnel
- Training and competency evidence where applicable
- Dosimetry arrangements where occupational monitoring applies
- Emergency and incident arrangements
4. Technical Evidence
- Applicable radiation safety assessment
- X-ray/QC and QA records
- Shielding and room documentation where applicable
- Corrective actions and closure evidence
- Document revisions and validity dates
FANR Renewal Readiness: A Practical Workflow
- 90–120 days before expiry: confirm licence scope, expiry date and facility/equipment changes.
- Readiness review: reconcile equipment, rooms, RPO responsibilities, RPP, QC, safety assessment and supporting records.
- Technical gap closure: coordinate required testing, assessments, document updates and corrective actions.
- Application preparation: assemble the current evidence set and submit through the applicable FANR process.
- Regulatory follow-up: respond to FANR requests for additional information within the specified timeframe.
- Post-renewal control: record the outcome and keep the compliance calendar current.
FANR states that additional information requested for a licence application is generally to be provided within 10 working days unless otherwise specified, and an application may be rejected or the review stopped if requirements are not adequately addressed.

Illustrative compliance image · Source: Unsplash / Nappy
FANR Administrative Fines: What Facilities Should Know
The UAE’s current administrative-penalty schedule under Cabinet Resolution No. 131 of 2025 is effective from 31 July 2026. The schedule includes risk-based penalties for failure to submit renewal application documents within the timeframe determined by FANR’s risk assessment.
| Violation / renewal issue | Administrative fine |
|---|---|
| Failure to submit low-risk licence renewal documents within the applicable timeframe | AED 100/day, max AED 3,000 |
| Failure to submit medium-risk licence renewal documents within the applicable timeframe | AED 200/day, max AED 6,000 |
| Failure to submit high-risk licence renewal documents within the applicable timeframe | AED 300/day, max AED 9,000 |
| Engaging in a regulated activity contrary to licensing conditions | AED 10,000/month |
| Submitting incorrect or incomplete documents, data, information, reports or records | AED 5,000 |
| Failure to display the licence in a visible place for customers | AED 2,500 |
Important: These are administrative penalties listed in the current schedule and are not a statement that every late renewal receives the same fine. Risk classification, the specific violation and FANR’s applicable timeframe matter. Facilities should verify the current official schedule and their specific regulatory status before relying on a penalty figure.
Additional General FANR Penalties in Cabinet Resolution No. 131 of 2025
The official schedule contains further general violations that were not shown in the first table:
| No. | General violation | Fine |
|---|---|---|
| 1 | Failure to register a radiation source. | AED 500 |
| 7 | Failure to take required measures upon cessation of a regulated activity or before surrendering a licence. | AED 10,000/month |
| 9 | Failure to submit required notifications, information or reports, or failure to comply with prescribed submission timelines. | AED 10,000 |
| 10 | Delay in submitting required notifications, information or reports or complying with deadlines. | AED 2,000 |
| 11 | Failure to protect, maintain and retain required records and documents as prescribed. | AED 10,000 |
| 12 | Failure to allow immediate and unrestricted access for regulatory inspection or assist an Authority inspector. | AED 20,000 |
| 13 | Delay in allowing inspection access or providing inspector assistance. | AED 4,000 |
| 14 | Failure to take corrective and/or preventive measures required by FANR. | AED 20,000 |
| 15 | Delay in taking required corrective and/or preventive measures. | AED 4,000 |
| 16 | Failure to establish, maintain, implement, evaluate and periodically review required policies, processes, plans and programs. | AED 20,000 |
| 17 | Delay in establishing, maintaining, implementing, evaluating or periodically reviewing required policies, processes, plans and programs. | AED 4,000 |
| 18 | Failure to establish and implement information-protection measures or prevent unauthorized transfer or disclosure. | AED 20,000 |
| 19 | Failure to establish, implement, maintain, review, monitor and periodically evaluate the required integrated management system. | AED 20,000 |
| 20 | Delay in periodic review, monitoring and evaluation of the required integrated management system. | AED 4,000 |
| 21 | Failure to provide workers with required information, training, qualification and equipment, including appropriate PPE. | AED 20,000 |
| 22 | Failure to perform required monitoring, evaluation, verification or inspection activities. | AED 20,000 |
| 23 | Delay in performing required monitoring, evaluation, verification or inspection activities. | AED 4,000 |
| 24 | Failure to comply with regulatory-clearance or radioactive-material disposal requirements. | AED 100,000 |
| 25 | Failure to ensure sufficient staff for safe, secure and safeguarded performance of a regulated activity. | AED 30,000 |
| 26 | Failure to comply with the State’s nuclear non-proliferation obligations. | AED 100,000 |
| 27 | Failure to implement an occupational health policy and worker health-surveillance program. | AED 50,000 |
| 28 | Loss of regulatory control over a Category 1 radioactive source. | AED 250,000 |
| 29 | Loss of regulatory control over a Category 2 or 3 radioactive source. | AED 150,000 |
| 30 | Loss of regulatory control over a Category 4 or 5 radioactive source. | AED 50,000 |
| 31 | Loss of regulatory control over special fissile material or source material. | AED 150,000 |
Scope note: Items 32 onward are sector-specific provisions, including nuclear facilities, decommissioning/radioactive waste and emergency response. They should not be presented as routine X-ray clinic renewal fines unless the licensed activity falls within those categories. View the complete official schedule.
Separate federal-law provisions can carry substantially more serious consequences for operating without the required authorization or intentionally/negligently violating the law, regulations or licence conditions.
What Happens If Your FANR Licence Is Near Expiry or Has Changed?
FANR-REG-29 requires proposed modifications to licensed regulated activities to be handled through the applicable amendment process. A renewal application should not be treated as automatic permission to continue operating after licence expiry; where timing or regulatory status is uncertain, confirm the position with FANR and address the renewal or amendment as early as possible. Examples include changes to the scope of the regulated activity, protection and safety arrangements, facility/operation scope, location or licence information, and inventory.
Equipment Changes
Facility Changes
Protection Changes
How Medcare Hub Supports FANR Renewal
We turn renewal preparation into a controlled project rather than a last-minute document chase.
Technical review & regulatory note: This guide is prepared from the applicable FANR regulatory references cited on this page and is intended for practical compliance planning. Medcare Hub provides technical and documentation support; FANR remains the authority responsible for regulatory decisions. Last reviewed: 6 October 2026.
01
Identify missing, outdated or inconsistent evidence.
02
Coordinate applicable radiation safety assessments, QC and related technical services.
03
Organize documents, equipment records and corrective-action evidence.
04
Support regulatory correspondence and readiness for the next compliance cycle.
Related FANR Services
Renewal readiness may involve more than one technical service. Depending on your facility and regulated activity, you may also need the supporting services below. For the controlling requirements, always check the latest FANR official e-Services and licensing information.
Is Your FANR Licence Within 90 Days of Expiry?
Send us your licence expiry date and facility/equipment details. We can help you identify the renewal-readiness work that should be addressed before submission.
Frequently Asked Questions
Official FANR and UAE Regulatory Sources
For the controlling requirements, use the latest publications from FANR and applicable UAE legislation. FANR’s published national reporting confirms that the FANR e-Licensing system provides online services for licensing and related radiation-safety functions, including inventory and occupational dose-record management where applicable.
Official Reference for Administrative Fines
- Cabinet Resolution No. (131) of 2025 — Administrative Penalties — View Official UAE Legislation
- Administrative Penalties Schedule — View Official Penalties Schedule (PDF)
Other Official References
Discuss FANR License Renewal with MedCare Hub
Need help with FANR License Renewal? Get practical UAE-focused support for documentation, technical requirements, compliance preparation and the next steps for your facility. Share your organisation type, location and relevant service details so the team can guide your enquiry. Confirm applicable requirements with the responsible authority.